Moving from concept and engineering design to field implementation within a specified time frame can be a major challenge. TSI achieves this goal by first preparing a preliminary engineering and basic data package from which a more precise implementation cost estimate and schedule can be prepared. This information can then be used by the client to make reasonable implementation commitments to the regulators and budgeting forecasts to its management.
                                     
Project links are listed below:


Project 1 - Vacuum Extraction System Design
Project 2 - Two-Phase Vacuum Extraction Pilot Study and Remedial Design
Project 3 - Two-Phase Vacuum Extraction Pilot Study
Project 4 - Vacuum Extraction and Bioventing
Project 5 - Two-Phase Vacuum Extraction System for Groundwater Remediation - Gasoline Service Station
Project 6 - Soil & Groundwater Remediation Gasoline Station & Convenience Store
Project 7 - Emergency Cleanup of Water Supply
Project 8 - Free Product Gasoline Recovery
Project 9 - Bioventing, Bioremediation and Stabilization Treatability Studies
Project 10 - TPVE in Clayey Soil and Fractured Bedrock


Project 1 - Gasoline pipeline break - Sun Oil Company
Project 2 - Gasoline storage tank spill - Exxon
Project 3 - Gasoline pipeline break - Sun Pipeline Company
Project 4 - Gasoline spill from underground storage tanks - Conoco, Inc.
Project 5 - Fuel oil contamination in surrounding soils
Project 6 - Jet A fuel soil contamination - Eaton Corporation
Project 7 - Gasoline, jet and diesel fuel soils contaminated - Petroleum product storage terminal
Project 8 - Conducted demonstration projects for bioremediation technologies treating chlorinated organic constituents in the groundwater and soil at Dover Air Force Base
Project 9 - Groundwater contaminated with chlorinated solvents - Air Force Center for Environmental Excellence
Project 10 - Groundwater contamination of 1,1,1-TCA, PCE - Manufacturing facility
Project 11 - TCE contamination of the groundwater - Altus Air Force Base

 
CASE HISTORIES

Published
papers

Contact/Quotes

Copyright 2006 Terra Systems, Inc.  [ Home ]  [ Products ]  [ Services ]  [ Why TSI ]  [ Related Links ]  [ Case Histories]  [ Published Papers ]  [ Contact/Quote ]  [ FAQs ]
Site developed and designed by:   ARKcreations Web Design 2006