SITE REMEDIATION CASE HISTORIES

Moving from concept and engineering design to field implementation within a specified time frame can be a major challenge. TSI achieves this goal by first preparing a preliminary engineering and basic data package from which a more precise implementation cost estimate and schedule can be prepared. This information can then be used by the client to make reasonable implementation commitments to the regulators and budgeting forecasts to its management.

Implementation consists of completing the detailed engineering design and carrying out the full range of remedial operations. In addition to developing a practical engineering solution, TSI is also able to provide an experienced and well-managed work force in the field, making the project implementation a smooth process. At the beginning of the project, a clear understanding of the required checkpoints and engineering, security, labor, and safety standards is established.

Each phase of the project is carefully analyzed to ensure that the schedule and budget can be met to achieve the prescribed scope of work. Special emphasis is placed on anticipating and preventing potential accidents and safety incidents that could otherwise interrupt project execution.

Please continue to the following areas for information on projects that utilize this implementation approach.


trbtn.gif (738bytes) Regulatory Compliance Analysis

trbtn.gif (738bytes) Waste Disposal Management

trbtn.gif (738bytes) Feasibility Studies

trbtn.gif (738bytes) In-situ Vacuum Extraction

trbtn.gif (738bytes) In-situ and Ex-situ Bioremediation

trbtn.gif (738bytes) Conventional Groundwater Treatment

trbtn.gif (738bytes) Mobile Thermal Desorption

home2.gif (2241bytes) Terra Systems Home Page